@baby9992006

A multi-level hybrid framework applied to the general flow-shop scheduling problem

, and . Computers & Operations Research, 29 (13): 1873--1901 (November 2002)
DOI: 10.1016/S0305-0548(01)00064-8

Links and resources

Tags