Article,

Design Considerations for Jordan 400kV Transmission Lines

, , , and .
(1982)

Abstract

This paper briefly outlines the various aspects of electrical, mechanical and civil engineering design which were investigated to establish the parameters to be used in specifying the tender requirements for the first 400kV overhead transmission lines in Jordan.

Tags

Users

  • @chkokalis
  • @ceps

Comments and Reviews