From post

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed.

 

Другие публикации лиц с тем же именем

Dynamic operations and manpower scheduling for high-mix, low-volume manufacturing., , и . ETFA, стр. 54-57. IEEE, (2008)Implementing Distribution Requirement Planning and Scheduling System for Lens Manufacturing Company., , , и . IEEM, стр. 701-705. IEEE, (2022)Hybrid discrete harmony search algorithm for scheduling re-processing problem in remanufacturing., , , , и . GECCO, стр. 1261-1268. ACM, (2013)A hybrid artificial bee colony algorithm for the job-shop scheduling problem with no-wait constraint., , , , и . Soft Comput., 21 (5): 1193-1202 (2017)APS, ERP and MES systems integration for semiconductor backend assembly., , , , , и . ICARCV, стр. 1403-1408. IEEE, (2002)A rule-based heuristic finite capacity scheduling system for semiconductor backend assembly., , , , , , , , и . Int. J. Computer Integrated Manufacturing, 17 (8): 733-749 (2004)Implementing Real-time Scheduling System for a Precision Engineering Company in Singapore., , , , , , , и . IEEM, стр. 736-740. IEEE, (2020)A heuristic approach for scheduling multi-chip packages for semiconductor backend assembly., , и . ETFA, стр. 1024-1030. IEEE, (2007)Common capacity modelling for multi-site planning: case studies., , , и . ETFA, стр. 336-343. IEEE, (2007)A Heuristics-based Advanced Planning and Scheduling System with Bottleneck Scheduling Algorithm., , , и . ETFA, стр. 240-247. IEEE, (2006)