Author of the publication

The Benefit of Control Knowledge and Heuristics During Search in Planning.

, and . ICAART (2), page 552-559. SciTePress, (2016)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

Planning as Tabled Logic Programming., , and . CoRR, (2015)The First Competition on Knowledge Engineering for Planning and Scheduling., and . AI Magazine, 27 (1): 97-98 (2006)Reactive Recovery from Machine Breakdown in Production Scheduling with Temporal Distance and Resource Constraints., and . ICAART (2), page 119-130. SciTePress, (2015)The Benefit of Control Knowledge and Heuristics During Search in Planning., and . ICAART (2), page 552-559. SciTePress, (2016)Attributed Transition-Based Domain Control Knowledge for Domain-Independent Planning (Extended Abstract)., , , and . ICDE, page 3879-3880. IEEE, (2023)On Modeling Planning Problems: Experience from the Petrobras Challenge., and . MICAI (2), volume 8266 of Lecture Notes in Computer Science, page 466-477. Springer, (2013)Hierarchical Task Model for Resource Failure Recovery in Production Scheduling., and . MICAI (1), volume 10061 of Lecture Notes in Computer Science, page 362-378. Springer, (2016)Online Multi-Agent Pathfinding., , , , and . AAAI, page 7732-7739. AAAI Press, (2019)Mixing Planning and Scheduling to Model Complex Process Environments.. PACPL, page 329-332. Practical Application Company Ltd., (2000)Integrating Time and Resources into Planning., and . ICTAI (2), page 71-78. IEEE Computer Society, (2010)978-0-7695-4263-8.