This is again a small JMS configuration stuff we have to do in JBoss 5. There is considerable difference in doing it in JBoss 5 compared to JBoss 4 and don’t expect our old configuration to work well with JBoss 5 without any change. In JBoss 5 they are using JBoss Messaging in place of JBoss MQ. You can read a detailed post on migrating from JBoss 4 to JBoss 5 here.
Upgrading JBoss 4 to JBoss 5 with Java 5 to Java 6
The information presented here comes from an effort to upgrade a Java enterprise application to the most current versions of all of its parts; primarily to get onto Java 6. Its starting system specifications were the following:
The traditional way to integrate JSF and Spring was to define JSF beans in faces-config as managed beans and refer to the spring beans using the managed-property configuration. With the help of the spring’s delegatingvariableresolver the managed property is resolved from spring application context and JSF’s IOC injects the bean to the JSF Managed bean instance. I’ve written an article it about this way before.First approach is modelled as follows