Author of the publication

A comparison of the performance of various project control methods using earned value management systems

, and . Expert Systems with Applications, 42 (6): 3159 - 3175 (2015)
DOI: http://dx.doi.org/10.1016/j.eswa.2014.12.007

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

On the resource renting problem with overtime., , and . Comput. Ind. Eng., (2017)Influence of learning in resource-constrained project scheduling., and . Comput. Ind. Eng., (2015)Applying a hybrid job shop procedure to a Belgian manufacturing company producing industrial wheels and castors in rubber., , and . Comput. Ind. Eng., 61 (3): 697-708 (2011)A hybrid scatter search heuristic for personalized crew rostering in the airline industry., and . Eur. J. Oper. Res., 206 (1): 155-167 (2010)Maximising the weighted number of activity execution modes in project planning., and . Eur. J. Oper. Res., 270 (3): 999-1013 (2018)On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints., , and . Manag. Sci., 47 (8): 1113-1121 (2001)RanGen: A Random Network Generator for Activity-on-the-Node Networks., , and . J. Sched., 6 (1): 17-38 (2003)An exact algorithm for an integrated project staffing problem with a homogeneous workforce., and . J. Sched., 19 (2): 107-133 (2016)Branching strategies in a branch-and-price approach for a multiple objective nurse scheduling problem., and . J. Sched., 13 (1): 77-93 (2010)Comparison and hybridization of crossover operators for the nurse scheduling problem., and . Ann. Oper. Res., 159 (1): 333-353 (2008)