From post

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed.

 

Другие публикации лиц с тем же именем

Evaluating Supply-And Reverse Logistics Alternatives in Building Construction Using Simulation., , , и . WSC, стр. 1-12. IEEE, (2021)External Change in Large Engineering Design Projects: The Role of the Client., , и . IEEE Trans. Engineering Management, 53 (3): 426-439 (2006)From Activity Recognition to Simulation: The Impact of Granularity on Production Models in Heavy Civil Engineering., , , , и . Algorithms, 16 (4): 212 (апреля 2023)Extreme modeling: modeling design development in unpredictable environments., , и . WSC, стр. 515-522. WSC, (2001)Knowledge-based assembly of simulation networks using construction designs, plans, and methods., , и . WSC, стр. 1145-1152. ACM, (1994)Analyzing implementation of lean production control with the Viable System Model., , , и . IEEM, стр. 443-447. IEEE, (2014)Upstream Problem Solving Under Uncertainty and Ambiguity: Evidence From Airport Expansion Projects., , и . IEEE Trans. Engineering Management, 55 (3): 508-522 (2008)Altering the SightPlan knowledge-based systems., , и . Artif. Intell. Eng. Des. Anal. Manuf., 6 (1): 19-37 (1992)CEPM 3: contributors to lead time in construction supply chains: case of pipe supports used in power plants., , , и . WSC, стр. 1745-1751. WSC, (2002)Comparison of simulation modeling techniques that use preemption to capture design uncertainty., и . WSC, стр. 1504-1511. WSC, (2001)