Author of the publication

Improvements in functional simulation addressing challenges in large, distributed industry projects.

. DAC, page 11-14. ACM, (2003)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

Accelerating system integration by enhancing hardware, firmware, and co-simulation., , , , , and . IBM J. Res. Dev., 48 (3-4): 569-582 (2004)Post-Silicon Validation of the IBM POWER8 Processor., , , , , , , and . DAC, page 56:1-56:6. ACM, (2014)Hyper-acceleration and HW/SW co-verification as an essential part of IBM eServer z900 verification., , and . IBM J. Res. Dev., 46 (4-5): 597-606 (2002)Formal Verification versus Simulation in Functional Verification -- An Industry Perspective.. MBMV, page 123-123. Shaker, (2002)The Verification Cockpit - Creating the Dream Playground for Data Analytics over the Verification Process., , , , , , , , , and 2 other author(s). Haifa Verification Conference, volume 9434 of Lecture Notes in Computer Science, page 51-66. Springer, (2015)Practical experiences in functional simulation. An integrated method from unit to co-simulation.. HLDVT, page 42-44. IEEE Computer Society, (2002)Solutions to IBM POWER8 verification challenges., , , , , , , , , and 12 other author(s). IBM J. Res. Dev., (2015)Addressing verification challenges of heterogeneous systems based on IBM POWER9., , , , , , , , , and 1 other author(s). IBM J. Res. Dev., 62 (4/5): 11:1-11:12 (2018)Configurable system simulation model build comprising packaging design data., , , and . IBM J. Res. Dev., 48 (3-4): 367-378 (2004)Improvements in functional simulation addressing challenges in large, distributed industry projects.. DAC, page 11-14. ACM, (2003)