Author of the publication

Resource constraint scheduling with a fractional shared resource.

, and . Oper. Res. Lett., 39 (5): 363-368 (2011)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

Maximising Throughput in a Complex Coal Export System., , , , and . CoRR, (2018)Towards solving large-scale precedence constrained production scheduling problems in mining., , , and . GECCO, page 1137-1144. ACM, (2017)Heuristic algorithms for the single allocation p-hub center problem with routing considerations., , and . OR Spectrum, 41 (1): 99-145 (2019)An improved merge search algorithm for the constrained pit problem in open-pit mining., , , and . GECCO, page 294-302. ACM, (2019)A mixed integer programming model for long term capacity expansion planning: A case study from The Hunter Valley Coal Chain., , , , , , and . Eur. J. Oper. Res., 220 (1): 210-224 (2012)Modelling Australian land use competition and ecosystem services with food price feedbacks at high spatial resolution., , , , , , , , , and 1 other author(s). Environ. Model. Softw., (2015)Blocking Cyclic Job-Shop Scheduling Problems., , and . Algorithms, 15 (10): 375 (2022)Staff scheduling and rostering: A review of applications, methods and models., , , and . Eur. J. Oper. Res., 153 (1): 3-27 (2004)The 2-allocation p-hub median problem and a modified Benders decomposition method for solving hub location problems., , and . Comput. Oper. Res., (2019)ICE: a statistical approach to identifying endmembers in hyperspectral images., , , , , and . IEEE Trans. Geosci. Remote. Sens., 42 (10): 2085-2095 (2004)