Author of the publication

Modelling Requirements of a Manufacturing Design Application Using an E/R Schema.

, and . ER, page 249-267. North-Holland, (1987)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

Optimal Stockout Risk for a Component Mounted on Several Assembly Lines in Case of Emergency Supplies., and . MIM, page 58-63. International Federation of Automatic Control, (2013)Integrated Laycan and Berth Allocation and time-invariant Quay Crane Assignment Problem in tidal ports with multiple quays., , and . Eur. J. Oper. Res., 293 (3): 892-909 (2021)A Dynamic Hybrid Berth Allocation Problem with Routing Constraints in Bulk Ports., , and . APMS (1), volume 591 of IFIP Advances in Information and Communication Technology, page 250-258. Springer, (2020)Flexibility of dynamic blending with alternative routings combined with security stocks: a new approach in a mining supply chain., , , , and . Int. J. Prod. Res., 59 (21): 6419-6436 (2021)Modelling Requirements of a Manufacturing Design Application Using an E/R Schema., and . ER, page 249-267. North-Holland, (1987)Standardization, Commonality, Modularity: A Global Economic Perspective., and . APMS (1), volume 459 of IFIP Advances in Information and Communication Technology, page 365-375. Springer, (2015)Potential Benefits of Reverse Blending in the Fertilizer Industry., , and . APMS (1), volume 591 of IFIP Advances in Information and Communication Technology, page 227-236. Springer, (2020)Modeling sequence scrambling and related phenomena in mixed-model production lines., , and . Eur. J. Oper. Res., 237 (1): 177-195 (2014)DSS approach for heterogeneous parallel machines scheduling considering proximate supply chain constraints., , , , , and . Int. J. Prod. Res., 58 (18): 5502-5520 (2020)Scheduling of open-pit phosphate mine extraction., , , and . Int. J. Prod. Res., 56 (23): 7122-7141 (2018)