Author of the publication

Closed-loop inventory routing problem for perishable food with returnable transport items selection.

, , , and . Int. J. Prod. Res., 62 (1-2): 501-521 (January 2024)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

A Stable Tracking Control of Mobile Multi-robot Using Direct Lyapunov Method Based on Global Coordinate Representation., , and . CSAE, page 149:1-149:6. ACM, (2018)A Lagrangian relaxation approach for a multi-mode inventory routing problem with transshipment in crude oil transportation., , and . Comput. Chem. Eng., 35 (10): 2113-2123 (2011)Tank cycling and scheduling analysis of high fusion point oil transportation for crude oil operations in refinery., , , and . Comput. Chem. Eng., 34 (4): 529-543 (2010)MOOP: An Efficient Utility-Rich Route Planning Framework Over Two-Fold Time-Dependent Road Networks., , , , , and . IEEE Trans. Emerg. Top. Comput. Intell., 7 (5): 1554-1570 (October 2023)Scheduling on a two-machine permutation flow shop under time-of-use electricity tariffs., , , , and . Int. J. Prod. Res., 56 (9): 3173-3187 (2018)Improved model and efficient method for bi-objective closed-loop food supply chain problem with returnable transport items., , and . Int. J. Prod. Res., 60 (3): 1051-1068 (2022)Distributionally robust and risk-averse optimisation for the stochastic multi-product disassembly line balancing problem with workforce assignment., , , , and . Int. J. Prod. Res., 60 (6): 1973-1991 (2022)An exact method for disassembly line balancing problem with limited distributional information., , , , and . Int. J. Prod. Res., 59 (3): 665-682 (2021)Novel model and kernel search heuristic for multi-period closed-loop food supply chain planning with returnable transport items., , , , and . Int. J. Prod. Res., 57 (23): 7439-7456 (2019)Integrated berth allocation and quay crane assignment with maintenance activities., , , , and . Int. J. Prod. Res., 57 (11): 3478-3503 (2019)