Author of the publication

A Hybrid Simulation-Based Optimization Framework For Managing Modular Bridge Construction Projects: A Cable-Stayed Bridge Case Study.

, , , , and . WSC, page 3094-3105. IEEE, (2023)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

Practical Provably Secure Communication for Half-Duplex Radios., , , and . ICC, page 1-5. IEEE, (2011)Multi-Agent Resource Allocation (MARA) for modeling construction processes., and . WSC, page 2361-2369. WSC, (2008)Simphony Supply Chain Simulator: a simulation toolkit to model the supply chain of construction projects., , , and . Simulation, 87 (8): 657-667 (2011)Simulation Modeling For Sustainable Construction: A Case Study To Highlight The Social Aspect., , , and . WSC, page 2686-2697. IEEE, (2023)Integrated Analysis and Simulation for Enhancing Wall Assembly Process Efficiency by Resolving Bottlenecks., , and . WSC, page 3106-3117. IEEE, (2023)CEPM 1: optimal construction project planning., and . WSC, page 1704-1708. WSC, (2002)A prototype for project management game development using high level architecture., , , and . Int. J. Simul. Process. Model., 9 (3): 131-145 (2014)Application of gaming engines in simulation driven visualization of construction operations., and . J. Inf. Technol. Constr., (2011)A machine learning approach to predict production time using real-time RFID data in industrialized building construction., , and . Adv. Eng. Informatics, (2022)Random generation of industrial pipelines' data using Markov chain model., , and . Adv. Eng. Informatics, (2018)