Author of the publication

Cyclic jobshop hoist scheduling with multi-capacity reentrant tanks and time-window constraints.

, , and . Comput. Ind. Eng., (2018)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

A survey of scheduling with deterministic machine availability constraints., , and . Comput. Ind. Eng., 58 (2): 199-211 (2010)Dynamic hoist scheduling problem with multi-capacity reentrant machines: A mixed integer programming approach., , and . Comput. Ind. Eng., (2015)Reliability allocation problem in a series-parallel system., , and . Reliab. Eng. Syst. Saf., 90 (1): 55-61 (2005)Online leasing problem with price fluctuations and the second-hand transaction., and . J. Comb. Optim., 43 (5): 1280-1297 (2022)Lagrangian relaxation and column generation-based lower bounds for the Pm, hj1‖∑wiCiPm, hj1‖∑wiCi scheduling problem., , , and . Appl. Math. Comput., 219 (22): 10783-10805 (2013)Parallel machine scheduling with stochastic release times and processing times., , , , and . Int. J. Prod. Res., 59 (20): 6327-6346 (2021)Dynamic pricing for remanufacturing within socially environmental incentives., , , and . Int. J. Prod. Res., 58 (13): 3976-3997 (2020)Food inspector scheduling with outcome and daily-schedule effects., , , , and . Int. J. Prod. Res., 62 (3): 737-766 (February 2024)Risk-averse assembly line worker assignment and balancing problem with limited temporary workers and moving workers., , , , , and . Int. J. Prod. Res., 60 (23): 7074-7092 (2022)Two heuristics for coordinating production planning and transportation planning., , , and . Int. J. Prod. Res., 56 (21): 6872-6889 (2018)