Author of the publication

Knowledge Based Manufacturine System.

, and . PROLAMAT, volume 207 of IFIP, page 79-88. Springer, (2006)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

The Magic Matrix as Smart Scheduler, Concurrent and CAPM.. Manufacturing in the Era of Concurrent Engineering, volume B-6 of IFIP Transactions, page 143-158. North-Holland, (1992)All-Embracing Production Control.. Computer-Aided Production Management, page 77-93. Springer, (1988)CIM - The Future Technology (Invited Paper).. IFIP Congress, page 1035-1042. North-Holland/IFIP, (1986)Report on CIRP Review about C. A. P. P. (Computer Aided Process Planing)., and . Manufacturing in the Era of Concurrent Engineering, volume B-6 of IFIP Transactions, page 177-188. North-Holland, (1992)Report on TC5 CATE TASK FORCE (Computer Aided Effective Task Force).. Manufacturing in the Era of Concurrent Engineering, volume B-6 of IFIP Transactions, page 165-176. North-Holland, (1992)Integration of PM into CIM.. Computer-Aided Production Management, page 303-315. Springer, (1988)Knowledge Based Manufacturine System., and . PROLAMAT, volume 207 of IFIP, page 79-88. Springer, (2006)On-Line Optimisation by Simulator for Flexible Manufacturing Systems., , and . ITAMS, volume B-1 of IFIP Transactions, page 13-25. North-Holland, (1991)Topics for the Round Table Discussion on Concurrent Engineering.. Manufacturing in the Era of Concurrent Engineering, volume B-6 of IFIP Transactions, page 159-160. North-Holland, (1992)