Author of the publication

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

Integrated Distributed Production and Distribution Problem for Minimizing Earliness and Tardiness Penalty., , , , and . ICNSC, page 1-6. IEEE, (2021)A method of dense point cloud SLAM based on improved YOLOV8 and fused with ORB-SLAM3 to cope with dynamic environments., , , and . Expert Syst. Appl., (2024)Scheduling Dual-Objective Stochastic Hybrid Flow Shop With Deteriorating Jobs via Bi-Population Evolutionary Algorithm., , , and . IEEE Trans. Syst. Man Cybern. Syst., 50 (12): 5037-5048 (2020)A species based multiobjective evolutionary algorithm for multiobjective flow shop scheduling problem., , and . CEC, page 3243-3247. IEEE, (2015)A Q-learning based artificial bee colony algorithm for solving surgery scheduling problems with setup time., , , , and . Swarm Evol. Comput., (2024)Locate Multiple Pareto Optima Using a Species-Based Multi-objective Genetic Algorithm., , and . BIC-TA, volume 472 of Communications in Computer and Information Science, page 128-137. Springer, (2014)Integrated scheduling of multi-constraint open shop and vehicle routing: Mathematical model and learning-driven brain storm optimization algorithm., , , , and . Appl. Soft Comput., (2024)Artificial-Molecule-Based Chemical Reaction Optimization for Flow Shop Scheduling Problem With Deteriorating and Learning Effects., , , and . IEEE Access, (2019)Stochastic Dual-objective Disassembly Sequence Planning with Consideration of Learning Effect., , , , and . ICNSC, page 29-34. IEEE, (2019)Solving Sequence-dependent Disassembly Line Balancing Problem with Improved Cuckoo Search Algorithm., , , and . SMC, page 403-408. IEEE, (2019)