Author of the publication

An earned value model with risk analysis for project management under uncertain conditions.

, , and . J. Intell. Fuzzy Syst., 32 (1): 97-113 (2017)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

A novel interval type-2 fuzzy decision model based on two new versions of relative preference relation-based MABAC and WASPAS methods (with an application in aircraft maintenance planning)., and . Neural Comput. Appl., 32 (8): 3367-3385 (2020)Enhancing decision-making flexibility by introducing a new last aggregation evaluating approach based on multi-criteria group decision making and Pythagorean fuzzy sets., , and . Appl. Soft Comput., (2017)A new last aggregation method of multi-attributes group decision making based on concepts of TODIM, WASPAS and TOPSIS under interval-valued intuitionistic fuzzy uncertainty., , and . Knowl. Inf. Syst., 62 (4): 1371-1391 (2020)A new fuzzy multi-objective optimisation method with desirability function under uncertainty., , , and . Int. J. Appl. Decis. Sci., 9 (1): 100-120 (2016)A new approach for production project scheduling with time-cost-quality trade-off considering multi-mode resource-constraints under interval uncertainty., , , , , and . Int. J. Prod. Res., 61 (9): 2963-2985 (May 2023)An Artificial Intelligence Model-Based Locally Linear Neuro-Fuzzy for Construction Project Selection., , , and . J. Multiple Valued Log. Soft Comput., 25 (6): 589-604 (2015)A new interval type-2 fuzzy approach for analyzing and monitoring the performance of megaprojects based on earned value analysis (with a case study)., , and . Neural Comput. Appl., 31 (9): 5109-5133 (2019)A Hybrid Simulated Annealing Algorithm for Location of Cross-Docking Centers in a Supply Chain., , , and . Hybrid Metaheuristics, volume 7919 of Lecture Notes in Computer Science, page 12-21. Springer, (2013)Risk assessment for highway projects using jackknife technique., , , , and . Expert Syst. Appl., 38 (5): 5514-5524 (2011)A new hesitant fuzzy analytical hierarchy process method for decision-making problems under uncertainty., , and . IEEM, page 622-626. IEEE, (2014)