Author of the publication

Integrated lot-sizing and scheduling with overlapping for multi-level capacitated production system.

, , and . Int. J. Computer Integrated Manufacturing, 26 (7): 681-695 (2013)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

Green parallel machines scheduling problem: A bi-objective model and a heuristic algorithm to obtain Pareto frontier., , and . J. Oper. Res. Soc., 71 (6): 967-978 (2020)An integrated framework of genetic network programming and multi-layer perceptron neural network for prediction of daily stock return: An application in Tehran stock exchange market., , and . Appl. Soft Comput., (2019)Comments on "Scheduling jobs on a k-stage flexible flow-shop" Annals of Operations Research (2008) 164: 29-40., and . Ann. Oper. Res., 172 (1): 459-462 (2009)An aggregate production planning model for two phase production systems: Solving with genetic algorithm and tabu search., , and . Expert Syst. Appl., 39 (1): 1256-1263 (2012)Solving a parallel-line capacitated lot-sizing and scheduling problem with sequence-dependent setup time/cost and preventive maintenance by a rolling horizon method., , , and . Comput. Ind. Eng., (2022)A tri-level covering fortification model for facility protection against disturbance in r-interdiction median problem., , and . Comput. Ind. Eng., (2016)Mean-conditional value at risk model for the stochastic project scheduling problem., , and . Comput. Ind. Eng., (2020)Integration of carrier selection and supplier selection problem in humanitarian logistics., and . Comput. Ind. Eng., (2020)Trade-off between the costs and the fairness for a collaborative production planning problem in make-to-order manufacturing., , , and . Comput. Ind. Eng., (2018)Multi-period and multi-resource operating room scheduling under uncertainty: A case study., , and . Comput. Ind. Eng., (2018)