From post

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed.

 

Другие публикации лиц с тем же именем

The location routing problem with facility sizing decisions., , , , и . Int. Trans. Oper. Res., 30 (2): 915-945 (2023)Fatigue Integration to the Flowshop Scheduling Problem., , , и . SOHOMA, том 1136 из Studies in Computational Intelligence, стр. 135-147. Springer, (2023)A two-pheromone trail ant colony system - tabu search approach for the heterogeneous vehicle routing problem with time windows and multiple products., , , и . J. Heuristics, 19 (2): 233-252 (2013)A Simheuristic Algorithm for the Location Routing Problem with Facility Sizing Decisions and Stochastic Demands., , , , и . WSC, стр. 1265-1275. IEEE, (2020)Solving an Urban Goods Distribution Problem as the 2E-CVRP Model Using a MILP-based Decomposition Approach., , и . WEA, том 1274 из Communications in Computer and Information Science, стр. 153-164. Springer, (2020)A Hybrid Algorithm Based on Ant Colony System for Flexible Job Shop., , и . WEA, том 1685 из Communications in Computer and Information Science, стр. 198-209. Springer, (2022)Modeling the Parallel Machine Scheduling Problem with Worker- and Position-Dependent Processing Times., , , , и . APMS (3), том 632 из IFIP Advances in Information and Communication Technology, стр. 351-359. Springer, (2021)Applied optimization in manufacturing and services (APPOPT-2008)., и . Ann. Oper. Res., 181 (1): 767-768 (2010)Analyzing the Impact of Coordinated Decisions within a Three-Echelon Supply Chain., и . Int. J. Inf. Syst. Supply Chain Manag., 2 (2): 1-15 (2009)Ant colony optimization algorithm to minimize makespan and number of tardy jobs in flexible flowshop systems., , и . CLEI, стр. 1-10. IEEE, (2012)