From post

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed.

 

Другие публикации лиц с тем же именем

An enhanced model for the integrated production and transportation problem in a multiple vehicles environment., , , и . Soft Comput., 20 (4): 1415-1435 (2016)The implementation of neural network for semiconductor PECVD process., , , и . Expert Syst. Appl., 32 (4): 1148-1153 (2007)Developing a skip-lot sampling scheme by variables inspection using repetitive sampling as a reference plan., , и . Int. J. Prod. Res., 60 (10): 3018-3030 (2022)Preliminary Modeling for Technology Transfer of New Equipment Using Fuzzy ANP., , , и . IMECS, стр. 2149-2154. Newswood Limited, (2007)Solving lot-sizing problem with quantity discount and transportation cost., , и . Int. J. Systems Science, 44 (4): 760-774 (2013)A modified variables repetitive group sampling plan with the consideration of preceding lots information., , и . Ann. Oper. Res., 238 (1-2): 355-373 (2016)A variable-type skip-lot sampling plan for products with a unilateral specification limit., , и . Int. J. Prod. Res., 59 (14): 4140-4156 (2021)Operations management of new project development: innovation, efficient, effective aspects., , и . J. Oper. Res. Soc., 60 (6): 797-809 (2009)An Integrated Replemishment Model under Dynamic Demand Conditions., , и . ICINCO (2), стр. 614-619. SciTePress, (2012)A fuzzy ANP model for supplier selection as applied to IC packaging., , и . J. Intell. Manuf., 23 (5): 1477-1488 (2012)