Author of the publication

Developing a skip-lot sampling scheme by variables inspection using repetitive sampling as a reference plan.

, , and . Int. J. Prod. Res., 60 (10): 3018-3030 (2022)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

A fuzzy ANP model for supplier selection as applied to IC packaging., , and . J. Intell. Manuf., 23 (5): 1477-1488 (2012)An Integrated Replemishment Model under Dynamic Demand Conditions., , and . ICINCO (2), page 614-619. SciTePress, (2012)Minimizing the Total Completion Time for the TFT-Array Factory Scheduling Problem (TAFSP)., , and . ICCSA (1), volume 4705 of Lecture Notes in Computer Science, page 767-778. Springer, (2007)A repetitive group sampling plan based on the lifetime performance index under gamma distribution., , and . Qual. Reliab. Eng. Int., 38 (4): 2049-2064 (2022)An Evaluation Model for Green and Low-Carbon Suppliers., , , and . ICINCO (2), page 604-608. SciTePress, (2012)A new supplier performance evaluation model: A case study of integrated circuit (IC) packaging companies., and . Kybernetes, 39 (1): 37-54 (2010)Operations management of new project development: innovation, efficient, effective aspects., , and . J. Oper. Res. Soc., 60 (6): 797-809 (2009)A modified variables repetitive group sampling plan with the consideration of preceding lots information., , and . Ann. Oper. Res., 238 (1-2): 355-373 (2016)A variable-type skip-lot sampling plan for products with a unilateral specification limit., , and . Int. J. Prod. Res., 59 (14): 4140-4156 (2021)Solving lot-sizing problem with quantity discount and transportation cost., , and . Int. J. Systems Science, 44 (4): 760-774 (2013)