Author of the publication

Minimizing the Total Completion Time for the TFT-Array Factory Scheduling Problem (TAFSP).

, , and . ICCSA (1), volume 4705 of Lecture Notes in Computer Science, page 767-778. Springer, (2007)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

A fuzzy ANP model for supplier selection as applied to IC packaging., , and . J. Intell. Manuf., 23 (5): 1477-1488 (2012)An Integrated Replemishment Model under Dynamic Demand Conditions., , and . ICINCO (2), page 614-619. SciTePress, (2012)Minimizing the Total Completion Time for the TFT-Array Factory Scheduling Problem (TAFSP)., , and . ICCSA (1), volume 4705 of Lecture Notes in Computer Science, page 767-778. Springer, (2007)An enhanced model for the integrated production and transportation problem in a multiple vehicles environment., , , and . Soft Comput., 20 (4): 1415-1435 (2016)The implementation of neural network for semiconductor PECVD process., , , and . Expert Syst. Appl., 32 (4): 1148-1153 (2007)Developing a skip-lot sampling scheme by variables inspection using repetitive sampling as a reference plan., , and . Int. J. Prod. Res., 60 (10): 3018-3030 (2022)A variable-type skip-lot sampling plan for products with a unilateral specification limit., , and . Int. J. Prod. Res., 59 (14): 4140-4156 (2021)Operations management of new project development: innovation, efficient, effective aspects., , and . J. Oper. Res. Soc., 60 (6): 797-809 (2009)A modified variables repetitive group sampling plan with the consideration of preceding lots information., , and . Ann. Oper. Res., 238 (1-2): 355-373 (2016)Preliminary Modeling for Technology Transfer of New Equipment Using Fuzzy ANP., , , and . IMECS, page 2149-2154. Newswood Limited, (2007)