Author of the publication

Bi-Objective Scheduling of Fire Engines for Fighting Forest Fires: New Optimization Approaches.

, , , and . IEEE Trans. Intell. Transp. Syst., 19 (4): 1140-1151 (2018)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

A polynomial algorithm for multi-robot 2-cyclic scheduling in a no-wait robotic cell., , , and . Comput. Oper. Res., 38 (9): 1275-1285 (2011)Two-phase branch and bound algorithm for robotic cells rescheduling considering limited disturbance., , , and . Comput. Oper. Res., (2014)Cyclic hoist scheduling in large real-life electroplating lines., and . OR Spectrum, 29 (3): 445-470 (2007)Bi-Objective Scheduling of Fire Engines for Fighting Forest Fires: New Optimization Approaches., , , and . IEEE Trans. Intell. Transp. Syst., 19 (4): 1140-1151 (2018)Cyclic jobshop hoist scheduling with multi-capacity reentrant tanks and time-window constraints., , and . Comput. Ind. Eng., (2018)Closed-loop inventory routing problem for perishable food with returnable transport items selection., , , and . Int. J. Prod. Res., 62 (1-2): 501-521 (January 2024)Speed scaling in two-machine lot-streaming flow shops with consistent sublots., , and . J. Oper. Res. Soc., 72 (11): 2429-2441 (2021)An Improved Exact ε-Constraint and Cut-and-Solve Combined Method for Biobjective Robust Lane Reservation., , , and . IEEE Trans. Intell. Transp. Syst., 16 (3): 1479-1492 (2015)An efficient two-phase exact algorithm for the automated truck freight transportation problem., , , and . Comput. Ind. Eng., (2017)Fast Algorithm for High-Throughput Screening Scheduling Based on the PERT/CPM Project Management Technique., , , and . Algorithms, 17 (3): 127 (March 2024)